-
Bau Palm Oil Mill Sdn. Bhd.
Operation Date: May 2003
Capacity: 60 Tonne/Hour
-
Serian Palm Oil Mill Sdn. Bhd.
Operation Date: May 1997
Capacity: 60 Tonne/Hour
-
Saratok Palm Oil Mill Sdn. Bhd.
Operation Date: November 1994
Capacity: 60 Tonne/Hour
CONVERTING "WASTE INTO WEALTH"
-
Methane Trapping

- Minimise release of green house gas to the athmosphere
- Methane gas can be used for power generation and heating purpose (Potential: 2-3 MW / Mill)
- BAPOM (Completed) LAPOM 1, LAPOM 2 (17%), SEPOM & SAPOM (Coming Soon)
-
Fibre Mat

- Fibre mat are produced from Empty Fruit Bunch
- For mulching and soil erosion control
- Ongoing project at SEPOM (55%)
-
Kernel Crushing Plant

- To start the construction of Palm Kernel Crushing Plant in 2021
- The Palm Kernel Cake produced will be used as animal feed for livestock farming and aquaculture
-
Smoke Filtration

- Using Electrostatic Smoke Precipitator (ESP)
- BAPOM & LAPOM 2 - Completed
- SAPOM (80%), SEPOM (82%), LAPOM (45%)
-
Effluent Treatment

- Using Tertiary Effluent Treatment Pond to lower BOD level (<20ppm) compared to conventional pond system (>100ppm)
- Ensure the discharge effluent is environmental friendly
- Done in all palm oil mills

-
Bau Palm Oil Mill Sdn. Bhd.
Operation Date: May 2003
Capacity: 60 Tonne/Hour

-
Serian Palm Oil Mill Sdn. Bhd.
Operation Date: May 1997
Capacity: 60 Tonne/Hour

-
Saratok Palm Oil Mill Sdn. Bhd.
Operation Date: November 1994
Capacity: 60 Tonne/Hour
CONVERTING "WASTE INTO WEALTH"
-
Methane Trapping
- Minimise release of green house gas to the athmosphere
- Methane gas can be used for power generation and heating purpose (Potential: 2-3 MW / Mill)
- BAPOM (Completed) LAPOM 1, LAPOM 2 (17%), SEPOM & SAPOM (Coming Soon)
-
Fibre Mat
- Fibre mat are produced from Empty Fruit Bunch
- For mulching and soil erosion control
- Ongoing project at SEPOM (55%)
-
Kernel Crushing Plant
- To start the construction of Palm Kernel Crushing Plant in 2021
- The Palm Kernel Cake produced will be used as animal feed for livestock farming and aquaculture
-
Smoke Filtration
- Using Electrostatic Smoke Precipitator (ESP)
- BAPOM & LAPOM 2 - Completed
- SAPOM (80%), SEPOM (82%), LAPOM (45%)
-
Effluent Treatment
- Using Tertiary Effluent Treatment Pond to lower BOD level (<20ppm) compared to conventional pond system (>100ppm)
- Ensure the discharge effluent is environmental friendly
- Done in all palm oil mills
invalid quix collection shortcode!
For further inquiry:
Bau Palm Oil Mill
P.O Box 181, 94007 Bau
Tel: 082 - 850004 | Fax: 019 - 8542154
Serian Palm Oil Mill
P.O Box 150, 94700 Kuching
Tel: 082 - 895264 | Fax: 082 - 895393
Saratok Palm Oil Mill
P.O Box 84, 95497 Saratok
Tel: 083 - 220002 | Fax: 083 - 430286